Difference between revisions of "Vince-201105"
From Stadm
Jump to navigationJump to search(10 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
</font> | </font> | ||
==Week of 2011-05-28 to 2011-05-31== | ==Week of 2011-05-28 to 2011-05-31== | ||
− | + | ===2011-05-31 Tue -- 4 hrs=== | |
− | ===2011-05-31 Tue -- | + | *finished Disc RMA for Dozier |
+ | **from Naklin | ||
+ | *reorganized network switches in 6706 to make testing area more accessible | ||
+ | *audited and rolled up new ethernet cables | ||
<font color='blue'> | <font color='blue'> | ||
Line 18: | Line 21: | ||
</font> | </font> | ||
− | + | ||
==Week of 2011-05-21 to 2011-05-27== | ==Week of 2011-05-21 to 2011-05-27== | ||
− | + | ===2011-05-27 Fri -- 2 hrs=== | |
− | ===2011-05-27 Fri -- | + | *Finished Packaging Disc RMA's |
+ | **2 for Davey: "30 min total" | ||
+ | **1 infra | ||
+ | *stored new Disc Drives in inventory in server room | ||
===2011-05-26 Thu -- 0 hrs=== | ===2011-05-26 Thu -- 0 hrs=== | ||
Line 29: | Line 35: | ||
===2011-05-24 Tue -- 0 hrs=== | ===2011-05-24 Tue -- 0 hrs=== | ||
− | ===2011-05-23 Mon -- | + | ===2011-05-23 Mon -- 2 hrs=== |
+ | *Filled out two Disc RMAs | ||
+ | **"Riley" for Davey | ||
+ | **"Ashes" for Davey | ||
+ | *Researched more Drupal | ||
<font color='blue'> | <font color='blue'> | ||
Line 39: | Line 49: | ||
</font> | </font> | ||
− | + | ||
==Week of 2011-05-14 to 2011-05-20== | ==Week of 2011-05-14 to 2011-05-20== | ||
===2011-05-20 Fri -- 0 hrs=== | ===2011-05-20 Fri -- 0 hrs=== | ||
Line 45: | Line 55: | ||
===2011-05-19 Thu -- 0 hrs=== | ===2011-05-19 Thu -- 0 hrs=== | ||
− | ===2011-05-18 Wed -- | + | ===2011-05-18 Wed -- 2 hrs=== |
+ | *Read up on Drupal Documentation | ||
+ | *finished [[Waste Procedures]] wiki | ||
− | ===2011-05-17 Tue -- | + | ===2011-05-17 Tue -- 4 hrs=== |
+ | *Packed up the surveying equipment in 6706 and packed it under the back desk | ||
+ | *setup kvm switch for the test windows box and artinga in 6706 | ||
+ | *started revamping the wiki waste procedures page | ||
===2011-05-16 Mon -- 2 hrs=== | ===2011-05-16 Mon -- 2 hrs=== | ||
*read through and updated the [[Waste Procedures]] documentation page on the stadm wiki | *read through and updated the [[Waste Procedures]] documentation page on the stadm wiki | ||
− | + | ||
− | |||
<font color='blue'> | <font color='blue'> |
Latest revision as of 14:56, 31 May 2011
Contents
Daily Entries
Week of 2011-05-28 to 2011-05-31
2011-05-31 Tue -- 4 hrs
- finished Disc RMA for Dozier
- from Naklin
- reorganized network switches in 6706 to make testing area more accessible
- audited and rolled up new ethernet cables
2011-05-30 Mon -- 0 hrs -- Memorial Day
2011-05-29 Sun -- 0 hrs
2011-05-28 Sat -- 0 hrs
Week of 2011-05-21 to 2011-05-27
2011-05-27 Fri -- 2 hrs
- Finished Packaging Disc RMA's
- 2 for Davey: "30 min total"
- 1 infra
- stored new Disc Drives in inventory in server room
2011-05-26 Thu -- 0 hrs
2011-05-25 Wed -- 0 hrs
2011-05-24 Tue -- 0 hrs
2011-05-23 Mon -- 2 hrs
- Filled out two Disc RMAs
- "Riley" for Davey
- "Ashes" for Davey
- Researched more Drupal
2011-05-22 Sun -- 0 hrs
2011-05-21 Sat -- 0 hrs
Week of 2011-05-14 to 2011-05-20
2011-05-20 Fri -- 0 hrs
2011-05-19 Thu -- 0 hrs
2011-05-18 Wed -- 2 hrs
- Read up on Drupal Documentation
- finished Waste Procedures wiki
2011-05-17 Tue -- 4 hrs
- Packed up the surveying equipment in 6706 and packed it under the back desk
- setup kvm switch for the test windows box and artinga in 6706
- started revamping the wiki waste procedures page
2011-05-16 Mon -- 2 hrs
- read through and updated the Waste Procedures documentation page on the stadm wiki
2011-05-15 Sun -- 0 hrs
2011-05-14 Sat -- 0 hrs
Week of 2011-05-07 to 2011-05-13
2011-05-13 Fri -- 0 hrs
2011-05-12 Thu -- 0 hrs
2011-05-11 Wed -- 2 hrs
- Installed MS Office 2011 to "sparkle"
- setup second Mac-Mini and installed MS Office 2011
2011-05-10 Tue -- 4 hrs
- removed hard drives from Babel and Buoy
- setup new Mac-mini "sparkle"
- installed all updates
- on DHCP
2011-05-09 Mon -- 2 hrs
- finished the Disc RMA procedure on the stadm wiki
- worked on BASH scripting
2011-05-08 Sun -- 0 hrs
2011-05-07 Sat -- 0 hrs
Week of 2011-05-01 to 2011-05-06
2011-05-06 Fri -- 0 hrs
2011-05-05 Thu -- 0 hrs
2011-05-04 Wed -- 2 hrs
- finished all Disc RMAs
- 4 Davey(1 Hr total)
- 3 Dozier(45 min total)
- started a Disc RMA procedure on the stadm wiki
2011-05-03 Tue -- 4 hrs
- began Seagate Disc RMAs
- picked up and returned MatLab CD for Windows for Aaron
- formatted the ICESS website files/folders in a spreadsheet with Aaron
- typed up Darla's notes on webmigration
2011-05-02 Mon -- 2 hrs
- began Western Digital Disc RMAs
- worked on BASH scripting
2011-05-01 Sun -- 0 hrs
Reacharge Examples/Entry Instructions
Recharge Entry Examples (each entry is expected to follow a list tag entry in the final html (ie: an asterisk in the wiki editor)): NEES:20 min:Backups Frew:20:Backups -- implied units -- units default to minutes Dozier:1.5h:Backups -- units flexible - space between amt and units optional, h is shorthand for hours, m shorthand for minutes Davey/Frew/Dozier:20 min each:Backups -- create recharge entries for this amt of time for each of the categories Davey/Frew/Dozier:2 hours split:Backups and Desktop support -- split time equally between each of the categories More detailed Syntax: ENTRY = ACCT[[/ACCT]...]:AMT [UNIT [LOOP-OP]]:[DESC] -- one entry per line ACCT = PI | Project | Account | Category -- PI/Project/Acct/Category to charge: ie: Frew, Dozier, NEES, Dragon, Infra, conference, etc... AMT = float | integer -- Amount of time spent -- float or int UNIT = [hour|hr|h|minute|min|m] -- units of time to apply to amount - default is minute -- spaces optional between amt and units LOOP-OP = [each|split] -- specialized operators - CATEGORY list is split on "/"s and an entry created for each one when processed. Category examples: sysadm - systems administration work networking - efforts relating to departmental networking infra - efforts related to computer/networking infrastructure admin - efforts for administrative staff meeting - efforts for meetings and conferences hosted by our researchers attend??? - meetings/conferences/presentations that are attended for departmental purposes. backup - efforts relating to back dsr - efforts relating to departmental safety representative work stadm - efforts relating to any IT student assistants Project examples: - ie: NEES, Snow, Oceancolor, Dragon, CCBER