Difference between revisions of "Eddie-201308"
From Stadm
Jump to navigationJump to search(3 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
===Week of 2013-08-24 to 2013-08-30=== | ===Week of 2013-08-24 to 2013-08-30=== | ||
− | ====2013-08-30 Fri -- | + | ====2013-08-30 Fri -- 4.25 hrs==== |
+ | *it:3.25h: Testing Folder Sync, Setting up Mapping of Network Drive | ||
+ | *it:1h: Resolved pointing DNS to rumba, SRV added to default DNS | ||
− | ====2013-08-29 Thu -- | + | ====2013-08-29 Thu -- 5 hrs==== |
+ | *it:5h: Rumba, joining domain from windows, Group Policy Objects, Folder sync and Offline Files | ||
====2013-08-28 Wed -- 6 hrs==== | ====2013-08-28 Wed -- 6 hrs==== |
Latest revision as of 14:57, 30 August 2013
Contents
Daily Entries
Week of 2013-08-31 to 2013-08-31
Week of 2013-08-24 to 2013-08-30
2013-08-30 Fri -- 4.25 hrs
- it:3.25h: Testing Folder Sync, Setting up Mapping of Network Drive
- it:1h: Resolved pointing DNS to rumba, SRV added to default DNS
2013-08-29 Thu -- 5 hrs
- it:5h: Rumba, joining domain from windows, Group Policy Objects, Folder sync and Offline Files
2013-08-28 Wed -- 6 hrs
- it:2h: Recreating rumbas problem on local VM
- it:3h: Troubleshooting security permissions on VM
- it:1h: Reinstall and setup samba4 on rumba with correct security permissions, was samba4.2.0 91186fc, usable version is samba4.2.0 8f8e843
2013-08-27 Tue -- 6 hrs
- it:2h: Rebuilding and documenting Samba on Rumba, packages where missing for AD support, nss-pam-ldap, etc..
- it:2h: Looking through packages, removing and adding, documenting which packages make ./configure not spill out not founds
- it:2h: Troubleshooting not being able to change security permissions on windows
2013-08-26 Mon -- 5.5 hrs
- it:2h: Troubleshooting Rumba, discovered on wrong switch was blocking connection to RUmba from VM
- it:1h:Setup, Provisioning of EADM
- it:2.5h: Configuration of EADM, joining computers to domain, troubleshooting folder sync and security permissions
2013-08-25 Sun -- 0 hrs
2013-08-24 Sat -- 0 hrs
Week of 2013-08-17 to 2013-08-23
2013-08-23 Fri -- 0 hrs
2013-08-22 Thu -- 3 hrs
- it:3h:Troubleshooting AD on Rumba(eri.ucsb.edu) based off of AD VM(icess.ucsb.edu)
2013-08-21 Wed -- 2.5 hrs
- it:30m:BODO install into server room
- it:2h:Domain setup and joining to ICESS.UCSB.EDU
2013-08-20 Tue -- 5.5 hrs
- it:5.5h:trouble shooting rumba
2013-08-19 Mon -- 5.5 hrs
- it:3.5h: rumba to eadm.eri.ucsb.edu AD
- it:2h: joining windows computers to eadm
2013-08-18 Sun -- 0 hrs
2013-08-17 Sat -- 0 hrs
Week of 2013-08-10 to 2013-08-16
2013-08-16 Fri -- 0 hrs
2013-08-15 Thu -- 0 hrs
2013-08-14 Wed -- 4 hrs
- it:2h:Figuring out Rumba, firewall off couldn't ssh
- it:2h:Rollback of rumba, yum install of samba4
2013-08-13 Tue -- 2 hrs
- it:1h:research joining rumba to samba4 then demoting samba4
- it:1h:gpo on samba4 for folder synchronization
2013-08-12 Mon -- 2 hrs
- it:2h:Demoting samba4 so rumba can be DC
2013-08-11 Sun -- 0 hrs
2013-08-10 Sat -- 0 hrs
Week of 2013-08-03 to 2013-08-09
2013-08-09 Fri -- 2.5 hrs
- it:1.5h:Samba4 install and configuration on rumba
- it:1h:repair of CUE, Fan and Hard Drive problems
2013-08-08 Thu -- 3 hrs
- it:3h:Samba4 install on rumba
2013-08-07 Wed -- 0 hrs
2013-08-06 Tue -- 0 hrs
2013-08-05 Mon -- 0 hrs
2013-08-04 Sun -- 0 hrs
2013-08-03 Sat -- 0 hrs
Week of 2013-08-01 to 2013-08-02
2013-08-02 Fri -- 2.5 hrs
- it:1h:Mac Mini Server testing, repairing hard drive, getting fan to stop spinning radically
- it:1.5h: NFS Profiles with Kerberos Authentication on VM
2013-08-01 Thu -- 2 hrs
- it:1.5h:Repairing Hard Drive Mac Mini Server
Recharge Examples/Entry Instructions
Recharge Entries fall into 3 broad categories: Direct charges - charges to a PI, Category, Account fund - Done monthly Deferred charges - charges that are accumulated for Services (Disk Storage, Backups, Websites, etc) paid quarterly Departmental charges - entries that are made to track time taken for various services that are provided by the department. Possibly used by IT staff to make decisions Recharge Entry Examples (each entry is expected to follow a list tag entry in the final html (ie: an asterisk in the wiki editor)): *NEES:20 min:Backups -- basic entry, NEES charged 20 minutes for backups *Frew:20:Backups -- implied units -- units default to minutes *Dozier:1.5h:Backups -- units flexible - space between amt and units optional, h is shorthand for hours, m shorthand for minutes *Davey/Frew/Dozier:20 min each:Backups -- create recharge entries for this amt of time for each of the categories *Davey/Frew/Dozier:2 hours split:Backups -- split time equally between each of the categories *eri.web:20m:Work on research website Project examples: - ie: NEES, Snow, Oceancolor, Dragon, CCBER Account entries can be subcategorized by creating a hierarchy using "."'s to separate fields (ie: eri.space.girvetz) More detailed Syntax Breakdown (in pseudo BNF) : ENTRY = *ACCTSPEC:TIMESPEC:DESCRIPTION -- one entry per line ACCTSPEC = ACCT[[/ACCT]...] -- the Account/Category/Project/CostCenter to be recharged TIMESPEC = AMT [UNIT [LOOP-OP]] -- amount of time spent - default is minutes ACCT = PI | Project | Account | Category [.SubCategory[...]] -- PI/Project/Acct/Category: ie: Frew, NEES, Dragon, Infra, conf,... AMT = float | integer -- Amount of time spent -- float or int UNIT = [hour|hr|h|minute|min|m] -- units of time to apply to amount - default is minute -- spaces optional between amt and units LOOP-OP = [each|split] -- specialized operators - CATEGORY list is split on "/"s and an entry created for each one when processed. Non-direct Recharge Categories (and associated SubCategories): *admin - efforts for administrative staff *lic.[itt, matlab, math, arcgis] --licensing stuff. *web.[drupal,wiki,cms,ftp] -- not sure this will be a top level charge *stor.[disk,bk,tape] *stor.bk -- efforts relating to backups *stor.disk -- disk server related time *stor.tape -- tape backups *it.[net,dev,team,ucsb,stadm,dsr,nsmgmt] *it -- alone infers ERI business (infra/sysadm/blahblahblah). *it.net -- efforts relating to departmental networking (cabling) *it.dev -- software development, scripting, new services... *it.team -- efforts relating to IT team meetings/discussions... how about powow? *it.ucsb -- UCSB training/meetings/discussions/committees or campus greater good. *it.stadm -- efforts relating to any IT student assistants *it.dsr -- efforts relating to departmental safety representative work