+ | *eri: 1.5h: looked over old rack layout project and fpdf capabilities | ||
+ | *eri: 30m: labeled a few more cables, updated firewall section of cisn display instructions | ||
<font color='blue'> | <font color='blue'> |
Latest revision as of 12:54, 30 April 2012
Contents
Daily Entries
Week of 2012-04-28 to 2012-04-30
2012-04-30 Mon -- 2 hrs
- eri: 1.5h: looked over old rack layout project and fpdf capabilities
- eri: 30m: labeled a few more cables, updated firewall section of cisn display instructions
2012-04-29 Sun -- 0 hrs
2012-04-28 Sat -- 0 hrs
Week of 2012-04-21 to 2012-04-27
2012-04-27 Fri -- 3 hrs
- eri: 1.5h: labeled network cables
- eri: 1.5h: working with FPDF and rack description layout
2012-04-26 Thu -- 0 hrs
2012-04-25 Wed -- 0 hrs
2012-04-24 Tue -- 3 hrs
- eri: 2h: went with Aaron to Webb to fix cisn display
- eri: 1h: learning php stuff for rack desc. project
2012-04-23 Mon -- 2 hrs
- eri: 2h: got introduced to rack description php project
2012-04-22 Sun -- 0 hrs
2012-04-21 Sat -- 0 hrs
Week of 2012-04-14 to 2012-04-20
2012-04-20 Fri -- 0 hrs
2012-04-19 Thu -- 0 hrs
2012-04-18 Wed -- 0 hrs
2012-04-17 Tue -- 1.5 hrs
- eri: 1.5h: studied drupal concepts, worked on annual report drupal stuff
2012-04-16 Mon -- 4.5 hrs
- eri: 30m: reassembled Dunkirque(dead power supply)
- eri: 30m: moved junk from 6706 to 1st floor
- eri: 1h: brought CISN display to geol dept. and set it up with Aaron
- eri: 45m: getting back into drupal stuff
2012-04-15 Sun -- 0 hrs
2012-04-14 Sat -- 0 hrs
Week of 2012-04-07 to 2012-04-13
2012-04-13 Fri -- 0 hrs
2012-04-12 Thu -- 0 hrs
2012-04-11 Wed -- 0 hrs
2012-04-10 Tue -- 0 hrs
2012-04-09 Mon -- 3.5 hrs
- eri: 2h: removed batteries from UPS frames and prepared them for EHS pickup, put new batteries in frame for UPS 1000 for testing
- geol: 1h: worked out kinks in CISN display, can now remote login to cisndisplay account through ssh
2012-04-08 Sun -- 0 hrs
2012-04-07 Sat -- 0 hrs
Week of 2012-04-01 to 2012-04-06
2012-04-06 Fri -- 0 hrs
2012-04-05 Thu -- 0 hrs
2012-04-04 Wed -- 0 hrs
2012-04-03 Tue -- 2 hrs
- eri: 2h: finished update of CISN Display installation instructions
2012-04-02 Mon -- 4 hrs
- geol: 3.5h: finished installing CISN Display
- eri: 30m: updating old CISN Display installation instructions
2012-04-01 Sun -- 0 hrs
Recharge Examples/Entry Instructions
Recharge Entry Examples (each entry is expected to follow a list tag entry in the final html (ie: an asterisk in the wiki editor)): NEES:20 min:Backups Frew:20:Backups -- implied units -- units default to minutes Dozier:1.5h:Backups -- units flexible - space between amt and units optional, h is shorthand for hours, m shorthand for minutes Davey/Frew/Dozier:20 min each:Backups -- create recharge entries for this amt of time for each of the categories Davey/Frew/Dozier:2 hours split:Backups and Desktop support -- split time equally between each of the categories Project examples: - ie: NEES, Snow, Oceancolor, Dragon, CCBER More detailed Syntax: ENTRY = ACCT[[/ACCT]...]:AMT [UNIT [LOOP-OP]]:[DESC] -- one entry per line ACCT = PI | Project | Account | Category -- PI/Project/Acct/Category : ie: Frew, NEES, Dragon, Infra, conf,... AMT = float | integer -- Amount of time spent -- float or int UNIT = [hour|hr|h|minute|min|m] -- units of time to apply to amount - default is minute -- spaces optional between amt and units LOOP-OP = [each|split] -- specialized operators - CATEGORY list is split on "/"s and an entry created for each one when processed. Non-direct Recharge entries: *admin - efforts for administrative staff - *lic.[itt, matlab, math, arcgis] licensing stuff. *web.[drupal,wiki,cms,ftp] - *stor.[disk,bk,tape] **bk - efforts relating to backups **disk - disk server related time **tape - tape backups - *eri.[ ,net,dev,team,ucsb,stadm,dsr] **eri - alone infers ERI business (infra/sysadm/blahblahblah). **net - efforts relating to departmental networking (cabling, **dev - software development, scripting, new services... **team - efforts relating to IT team meetings/discussions... how about powow? **ucsb - UCSB training/meetings/discussions/committees or campus greater good. **stadm - efforts relating to any IT student assistants **dsr - efforts relating to departmental safety representative work