Difference between revisions of "Vince-201105"

From Stadm
Jump to navigationJump to search
 
(27 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
</font>
 
</font>
 
==Week of 2011-05-28 to 2011-05-31==
 
==Week of 2011-05-28 to 2011-05-31==
<!------------------------------- BEGIN COMMENTED WEEKLY SECTION ---------------------------------
+
===2011-05-31 Tue -- 4 hrs===
===2011-05-31 Tue -- 0 hrs===
+
*finished Disc RMA for Dozier
 +
**from Naklin
 +
*reorganized network switches in 6706 to make testing area more accessible
 +
*audited and rolled up new ethernet cables
  
 
<font color='blue'>
 
<font color='blue'>
Line 18: Line 21:
  
 
</font>
 
</font>
-----------------------------------END COMMENTED WEEKLY SECTION ----------------------->
+
 
 
==Week of 2011-05-21 to 2011-05-27==
 
==Week of 2011-05-21 to 2011-05-27==
<!------------------------------- BEGIN COMMENTED WEEKLY SECTION ---------------------------------
+
===2011-05-27 Fri -- 2 hrs===
===2011-05-27 Fri -- 0 hrs===
+
*Finished Packaging Disc RMA's
 +
**2 for Davey: "30 min total"
 +
**1 infra
 +
*stored new Disc Drives in inventory in server room
  
 
===2011-05-26 Thu -- 0 hrs===
 
===2011-05-26 Thu -- 0 hrs===
Line 29: Line 35:
 
===2011-05-24 Tue -- 0 hrs===
 
===2011-05-24 Tue -- 0 hrs===
  
===2011-05-23 Mon -- 0 hrs===
+
===2011-05-23 Mon -- 2 hrs===
 +
*Filled out two Disc RMAs
 +
**"Riley" for Davey
 +
**"Ashes" for Davey
 +
*Researched more Drupal
  
 
<font color='blue'>
 
<font color='blue'>
Line 39: Line 49:
  
 
</font>
 
</font>
-----------------------------------END COMMENTED WEEKLY SECTION ----------------------->
+
 
 
==Week of 2011-05-14 to 2011-05-20==
 
==Week of 2011-05-14 to 2011-05-20==
<!------------------------------- BEGIN COMMENTED WEEKLY SECTION ---------------------------------
 
 
===2011-05-20 Fri -- 0 hrs===
 
===2011-05-20 Fri -- 0 hrs===
  
 
===2011-05-19 Thu -- 0 hrs===
 
===2011-05-19 Thu -- 0 hrs===
  
===2011-05-18 Wed -- 0 hrs===
+
===2011-05-18 Wed -- 2 hrs===
 +
*Read up on Drupal Documentation
 +
*finished [[Waste Procedures]] wiki
 +
 
 +
===2011-05-17 Tue -- 4 hrs===
 +
*Packed up the surveying equipment in 6706 and packed it under the back desk
 +
*setup kvm switch for the test windows box and artinga in 6706
 +
*started revamping the wiki waste procedures page
  
===2011-05-17 Tue -- 0 hrs===
+
===2011-05-16 Mon -- 2 hrs===
 +
*read through and updated the [[Waste Procedures]] documentation page on the stadm wiki
  
===2011-05-16 Mon -- 0 hrs===
 
  
 
<font color='blue'>
 
<font color='blue'>
Line 60: Line 76:
  
 
</font>
 
</font>
-----------------------------------END COMMENTED WEEKLY SECTION ----------------------->
+
 
 
==Week of 2011-05-07 to 2011-05-13==
 
==Week of 2011-05-07 to 2011-05-13==
 
===2011-05-13 Fri -- 0 hrs===
 
===2011-05-13 Fri -- 0 hrs===
Line 66: Line 82:
 
===2011-05-12 Thu -- 0 hrs===
 
===2011-05-12 Thu -- 0 hrs===
  
===2011-05-11 Wed -- 0 hrs===
+
===2011-05-11 Wed -- 2 hrs===
 +
*Installed MS Office 2011 to "sparkle"
 +
*setup second Mac-Mini and installed MS Office 2011
  
===2011-05-10 Tue -- 0 hrs===
+
===2011-05-10 Tue -- 4 hrs===
 
*removed hard drives from Babel and Buoy
 
*removed hard drives from Babel and Buoy
 
*setup new Mac-mini "sparkle"
 
*setup new Mac-mini "sparkle"
 
**installed all updates
 
**installed all updates
**on DHCP  
+
**on DHCP
<font color='red'>
 
**MS Office still needs install
 
  
 
===2011-05-09 Mon -- 2 hrs===
 
===2011-05-09 Mon -- 2 hrs===

Latest revision as of 14:56, 31 May 2011

Daily Entries

Week of 2011-05-28 to 2011-05-31

2011-05-31 Tue -- 4 hrs

  • finished Disc RMA for Dozier
    • from Naklin
  • reorganized network switches in 6706 to make testing area more accessible
  • audited and rolled up new ethernet cables

2011-05-30 Mon -- 0 hrs -- Memorial Day

2011-05-29 Sun -- 0 hrs

2011-05-28 Sat -- 0 hrs

Week of 2011-05-21 to 2011-05-27

2011-05-27 Fri -- 2 hrs

  • Finished Packaging Disc RMA's
    • 2 for Davey: "30 min total"
    • 1 infra
  • stored new Disc Drives in inventory in server room

2011-05-26 Thu -- 0 hrs

2011-05-25 Wed -- 0 hrs

2011-05-24 Tue -- 0 hrs

2011-05-23 Mon -- 2 hrs

  • Filled out two Disc RMAs
    • "Riley" for Davey
    • "Ashes" for Davey
  • Researched more Drupal

2011-05-22 Sun -- 0 hrs

2011-05-21 Sat -- 0 hrs

Week of 2011-05-14 to 2011-05-20

2011-05-20 Fri -- 0 hrs

2011-05-19 Thu -- 0 hrs

2011-05-18 Wed -- 2 hrs

2011-05-17 Tue -- 4 hrs

  • Packed up the surveying equipment in 6706 and packed it under the back desk
  • setup kvm switch for the test windows box and artinga in 6706
  • started revamping the wiki waste procedures page

2011-05-16 Mon -- 2 hrs

  • read through and updated the Waste Procedures documentation page on the stadm wiki


2011-05-15 Sun -- 0 hrs

2011-05-14 Sat -- 0 hrs

Week of 2011-05-07 to 2011-05-13

2011-05-13 Fri -- 0 hrs

2011-05-12 Thu -- 0 hrs

2011-05-11 Wed -- 2 hrs

  • Installed MS Office 2011 to "sparkle"
  • setup second Mac-Mini and installed MS Office 2011

2011-05-10 Tue -- 4 hrs

  • removed hard drives from Babel and Buoy
  • setup new Mac-mini "sparkle"
    • installed all updates
    • on DHCP

2011-05-09 Mon -- 2 hrs

  • finished the Disc RMA procedure on the stadm wiki
  • worked on BASH scripting


2011-05-08 Sun -- 0 hrs

2011-05-07 Sat -- 0 hrs

Week of 2011-05-01 to 2011-05-06

2011-05-06 Fri -- 0 hrs

2011-05-05 Thu -- 0 hrs

2011-05-04 Wed -- 2 hrs

  • finished all Disc RMAs
    • 4 Davey(1 Hr total)
    • 3 Dozier(45 min total)
  • started a Disc RMA procedure on the stadm wiki

2011-05-03 Tue -- 4 hrs

  • began Seagate Disc RMAs
  • picked up and returned MatLab CD for Windows for Aaron
  • formatted the ICESS website files/folders in a spreadsheet with Aaron
  • typed up Darla's notes on webmigration

2011-05-02 Mon -- 2 hrs

  • began Western Digital Disc RMAs
  • worked on BASH scripting

2011-05-01 Sun -- 0 hrs

Reacharge Examples/Entry Instructions

Recharge Entry Examples (each entry is expected to follow a list tag entry in the final html (ie: an asterisk in the wiki editor)):
NEES:20 min:Backups
Frew:20:Backups -- implied units -- units default to minutes
Dozier:1.5h:Backups -- units flexible - space between amt and units optional, h is shorthand for hours, m shorthand for minutes
Davey/Frew/Dozier:20 min each:Backups -- create recharge entries for this amt of time for each of the categories
Davey/Frew/Dozier:2 hours split:Backups and Desktop support -- split time equally between each of the categories

More detailed Syntax:
ENTRY = ACCT[[/ACCT]...]:AMT [UNIT [LOOP-OP]]:[DESC] -- one entry per line
ACCT = PI | Project | Account | Category -- PI/Project/Acct/Category to charge: ie: Frew, Dozier, NEES, Dragon, Infra, conference, etc...
AMT = float | integer -- Amount of time spent -- float or int
UNIT = [hour|hr|h|minute|min|m] -- units of time to apply to amount - default is minute -- spaces optional between amt and units
LOOP-OP = [each|split] -- specialized operators - CATEGORY list is split on "/"s and an entry created for each one when processed.

Category examples:
sysadm - systems administration work
networking - efforts relating to departmental networking
infra - efforts related to computer/networking infrastructure
admin - efforts for administrative staff
meeting - efforts for meetings and conferences hosted by our researchers
attend??? - meetings/conferences/presentations that are attended for departmental purposes.
backup - efforts relating to back
dsr - efforts relating to departmental safety representative work
stadm - efforts relating to any IT student assistants

Project examples: - ie: NEES, Snow, Oceancolor, Dragon, CCBER

Other Stuff

AVWH: 168